Below are Photos of the work we performed on Residential and Commercial Job Sites. All were handled with care and precision. Time Frames were met and relationships were formed with our Clients. 

Bozeman Brewery

This project consisted of the removal of some Walls, Full removal of the Bathrooms, Flooring and Hauling of the Concrete for plumbing access in the Slab. 

Chinook  Pool

The community of Chinook needed a face lift of the pool so we came in and removed all concrete slabs on the property. Removed the kid pool entirely. Then cut down all sides of the pool to fit the new gutter system they were installing. And removed a portion on the bottom for new plumbing. 

Helena Disaster Warehouse

Government Commercial Jobsite. Over 200,000 pounds of Concrete and brick was removed from this site. Trenches were cut and removed in the slab. Walls were removed fully and partially. Openings for windows and doors were cut out and added. Paint on the floors were removed. 

Manhattan Residential House

For this Residential Job we gutted a good portion of the property for the remodeling. Containment walls and doors were added for dust control and protection for the house that was not being touched. Walls were removed entirely and partially. Flooring from tile to carpet was taken out. Radiant heat was saved for reuse. Sprayed Insulation was removed in some areas. 

Missoula Art Museum

Commercial Job in Missoula. protection was put up as the Museum was still open to the public. Removed the entry storefront. Granite stones were salvaged and reused. Tile floor was cut back for the addition to be added. 

MSU Bioscience Lab Building

Removed the EIFS siding on the project as they wanted to add new siding to this project. 

Missoula Montana 

This Lucky Lil's got a full remodel and we got called in for the demolition portion. We removed all the siding and EIFS as well. Removed the storefront and the smoking room. Removed all flooring and bathrooms in the property. 

MSU Linfield Hall

Concrete stairs were removed with its foundation. Concrete sidewalks were removed as well. The building was protected during deconstruction. 

MT Capitol Building

We had the privilege to work on the Capitol Building in Helena. Flooring was removed, Ceilings dropped, Concrete was cut and removed. Base and Trim were all detached and salvaged for reuse on this job.  Salaved what we could on this job as most of it was from the 1900's. 

West Yellowstone Hotel

The overhang was cut back to the building so a new roof system could be added. The Insulation on one roof was removed as well as it was penetrated by water for a long time. 